Speakers & participants of the ITACET training course |
Receiving token of appreciation from Dr. Ooi Teik Aun |
The training session provided an introduction to the principles of tunnel design throughout a project cycle, from planning, design and construction, through to implementation of a tunnel or underground project. Contents of the course is available at: link. Official report of the training course is available in IEM wesbite: Link
My presentation was on Case history studies from Singapore. I was able to present case histories from the projects I have been involved in Singapore, which includes:
- Thomson Line MRT tunnels
- Power transmission cable tunnels
- Other LTA projects involving underground linkway construction.
Summary of my presentation brief is available at: link