Book Review: Trapped Under the Sea

This book has been in my "To Read" list for a very long time. Only when the Breakthrough Magazine (current issue) wrote a review about this book, it gave me the final push to read this book without any delay. But once I started reading, it was so gripping and thrilling that I had to complete the book within a week.

The book describes the tragedy which occurred during construction of a waste treatment plant in Boston Harbor, USA. As with the most sewage outfall tunnels, this project has diffuser lines installed towards the end of the tunnel to disperse the treated sewage. The book describes about an incident where divers were sent into ~15km long un-ventilated tunnel (with individual breathing system) to  remove the safety plugs installed at the tunnel and diffuser connections.

Deer Island Treatment Plant and Sewage Outfall tunnels (source)
The author describes the the dangers faced by the workers due to the inability of the tunnel designers, constructors, and management who could have worked together to solve the issue. Rather they tried to insulate themselves from liabilities and to push the risks on to the other parties which made their relationship thoroughly dysfunctional. At the end, the dangerous cocktail of time, money, stubbornness and frustration (near the end of over budget , long delayed project) has caused the lives of workers.

Having a bit of experience myself in working for mines, tunnels and claustrophobic hyperbaric chambers, I have some idea of the "adventure" and risk that the job entitles to the people working in such conditions on a daily basis. Even then, I found the book baffling and I found it hard to digest the fact that these divers were exposed to such extreme risks.


Entering a hyperbaric chamber 
But this seem to be the reality of lump-sum low bid construction. The company bids the bare minimum and can make profit only when the cost turn out to be unusually low. In order to do so, the company weighs in too much on the responsibility that it assigns to a third party and the farther the managers are from the actual decision making, the greater is their tolerance for risk. In such an arrangement, as the problem arrives, the priority is not on solving them but to figure out who's is to blame and who is going to pay. Hence the problem gets a lot harder and more expensive to fix. Once relationship gets poisoned, the parties become so fixed in their position that they could no longer trust the intention of the other side.

If there is any incident, it is usually caused by a series of small bad decisions made by many individuals, none of which on its own would have been enough to produce a failure.The author draws the comparison with "Swiss cheese" model of failure which is often used by safety scientists. When the holes in organizational defects line up in ways that had not been foreseen, the problem require rapid interpretation and responses and here it is when that things can go wrong. 

I got to learn very good lessons for my professional as well as personal life based on the narrative presented in the book. I could immediately relate to some of my projects where opposing sides become fixed in their positions, relying on cognitive shortcuts as they are locked in adversarial contest. Some of my take away points are:

  • Accidents do happen when confidence runs high and tolerance for delay dips low. This should not let people accept looser standards in the name of greater speed. The more people do something without suffering bad outcome, the harder it could become to remain aware of the risks associated with that behavior.
  • Engineer should have a good sense and strong stomach to say no whenever he/she ethically believes so. An engineer has to plan to follow proven protocols rather than panic gut decisions.
Overall, a very interesting story documenting the heroism of the workers and mis-management of design and contract administration.

25 comments:

  1. Thank you dear, I found your information really useful. I would like to say thanks once again for this information.
    Accountants for construction workers in London

    ReplyDelete
  2. Business loans or personal loan within 2-3 working days with convenient rates.Apply today. Email: capitallendinghelpdesk@gmail.com
    Blog: https://capitallendingfince.blogspot.com/

    Geschäftskredite oder Privatkredite innerhalb von 2-3 Werktagen zu günstigen Konditionen. Bewerben Sie sich noch heute. E-Mail: capitallendinghelpdesk@gmail.com

    ReplyDelete
  3. It is very nice article on that topic. I was looking for something like which is interesting and knowledgeable.
    Construction company in Islamabad

    ReplyDelete
  4. You really shared a great blog. I read many blogs this one is very informative, please write few blogs on Textile channels
    Klimatizacija

    ReplyDelete
  5. This comment has been removed by the author.

    ReplyDelete
  6. Thank you for your work. Please visit this site if you are pressed with time and have a lot of writing assignments.

    ReplyDelete
  7. Our construction addition cost estimator help you finalize construction cost for a given area, or define a constructible area basis a budget. Even, Try out Area calculator, EMI calculator to get a realistic estimate of your actual costs in construction.

    ReplyDelete
  8. Best of luck to these brave and intelligent engineers.
    Custom software development Melbourne

    ReplyDelete
  9. I read your Article and Thank you so much,this is very useful post and i realy like it.keep sharing like this.
    https://indusdesignworks.com/online-drafting-services.php
    Online detailing services

    ReplyDelete
  10. Mcafee Login Account is your one-stop key for accessing and utilizing all the benefits and features of the amazing Mcafee security applications. visit here: https://mcafeepro.com/

    ReplyDelete
  11. I am stunned by the information that you have on this blog. It shows how well you fathom this subject.
    masters in data science

    ReplyDelete
  12. After looking into a number of the blog articles on your web site, I honestly like your technique of blogging. I saved it to my bookmark site list and will be checking back soon. Please visit my web site as well and let me know how you feel. " Work From Home Monitoring Software"

    ReplyDelete
  13. This pandemic i got an amazing online portal Where i sold my house this platform is known as sale house fast california and get my property encash in profits only in economical crisis.

    ReplyDelete
  14. Great Blog, there is so much reality written in this content and everything is something which is very hard to be argued. Top notch blog having excellent content.
    Construction Company in Islamabad

    ReplyDelete
  15. Planning application drawings
    are a great way of getting your planning permission for construction projects, or of simply drawing up your plan so you can check it over before beginning. If you're going to be constructing your own home then a drawing of your house is probably the best thing that you can do, but if you're planning to buy a new home then having these drawings prepared before hand can save a lot of hassle later on.


    CAD Services in USA
    Mechanical Drafting Services
    CAD Conversion Services

    ReplyDelete
  16. Thank you, getting lot of good and reliable information from your post. Thank You for sharing wonderful Post.
    https://indusdesignworks.com/architectural-designer.php
    Online architectural designer

    ReplyDelete
  17. it will to our Engineering work..Special Thanks for sharing..Melange Restoration Inc. assists with all steps as Local Law 11 contractors in New York City. Melange Restoration made any building repairing swiftly and at minimal difficulty to you or your tenants.

    ReplyDelete
  18. Very Useful information , Thank you https://prudentengineers.co.nz/geotechnics-and-soil-engineering/

    ReplyDelete
  19. Excellent blog
    Are you looking to hire a tunnel boring machine? Contact us!

    ReplyDelete
  20. you privided very informative content but i have the info about fastest sattaking result Sites. this site provides
    Desawar Result superfast,
    सट्टा किंग result before any site in the world. also
    Gali Result at 5 am every morning.
    satta king result everyday, and satta king this sites gives some leaks from the company.
    Gali Result, Desawar And satta king this sites are giving superfast results in the world no one gives results and leaks before this sites. this is very old and trusted site witch gives best info about satta king results. your info is also good but i got more informisssion realated satta king and also you contact me on desawar Result so we can join togather and know more about this things.

    ReplyDelete
  21. Thanks for sharing. Reach out to Dynamic Netsoft Technologies, We're a Microsoft Certified Gold Partners and we're experts in providing Cloud based construction management software

    ReplyDelete